Results
- Localization is performed successfully for all cases
- In all the cases examined DLVs produced a set which is exclusively the damaged region.
Case 2 - Damage Pattern (ii) : All braces on the 1st and 3rd floor removed
Sharp drop of the index still indicates floors 1 & 3 as damaged